Zhang, H; Yu, L and Zhang, W (2020) Dynamic performance incentive model with supervision mechanism for PPP projects. Engineering, Construction and Architectural Management, 27(9), pp. 2643-2659. ISSN 0969-9988
Abstract
Purpose: This study is aimed to explore the dynamic performance incentive model for a flexible PPP contract to handle uncertainties based on supervision during the long-time concession period, so as to ensure operation performance and benefits of the public sector while protecting the economic benefit of the private sector, thus avoiding unnecessary renegotiation. Design/methodology/approach: The microeconomic and principal–agent theories and relevant studies on the basic incentive model and flexible contract are fully utilized. The procedure for developing the dynamic incentive model and the assumptions about the quantitative relationships among fundamental variables or factors are first proposed. The static incentive model without incentive parameter adjustment and then the dynamic incentive model allowing incentive parameter adjustment are successively developed. Finally, the propositions regarding the valid adjustment ranges of the incentive parameter with respect to the economic, social and hybrid benefits of the public sector and the economic benefit of the private sector are suggested. Findings: The dynamic incentive model enables to achieve a flexible contract to handle uncertainties on the PPP project to ensure the benefits of the public sector while protecting the benefit of the private sector. The economic, social and hybrid benefits of the public sector and the economic benefit of the private sectors can be respectively realized through adjusting the reward–punishment coefficient under different adjustment ranges and different importance. The incentive model is able to ensure the benefits of the public sector while protecting the benefit of the private sector by controlling the private sector's effort level unknown to the public sector. Originality/value: The dynamic incentive model helps implement a flexible PPP contract to handle uncertainties during the operation period, thus controlling the effort level of the private sector and ensuring the benefits of the public sector while protecting the economic benefit of the sector. It enables to clarify the quantitative relationships between the operation performance, the benefits of the stakeholders, the effort level of the private sector and the reward–punishment coefficient. This study contributes to the domain knowledge of the incomplete contract theory for designing a flexible PPP contract with dynamic incentive and supervision mechanism by applying the microeconomic and principal–agent theories.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | contract renegotiation; dynamic performance incentive; flexible contract; microeconomics; principal–agent theory; public–private partnership; supervision |
| Index terms: | microeconomics, supervision, concession period, private sector, contract theory, partnership, public sector, methodology, agent |
| Subjects: | contract structure, research methods, partnership management, industry analysis, administrative law, control systems, practitioner, business development, legal systems |
| Topics: | Legal Issues, Procurement, Roles and Professions, Stakeholder Management, Research Practice, Project Management, Business Strategy |
| Descriptive scope: | 3 PCT |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here