Elkabalawy, M and Moselhi, O (2022) Optimized resource-constrained method for project schedule compression. Engineering, Construction and Architectural Management, 29(5), pp. 2106-2129. ISSN 0969-9988
Abstract
Purpose: This paper aims to present an integrated method for optimized project duration and costs, considering the size and cost of crews assigned to project activities' execution modes. Design/methodology/approach: The proposed method utilizes fuzzy set theory (FSs) for modeling uncertainties associated with activities' duration and cost and genetic algorithm (GA) for optimizing project schedule. The method has four main modules that support two optimization methods: modeling uncertainty and defuzzification module; scheduling module; cost calculations module; and decision-support module. The first optimization method uses the elitist non-dominated sorting genetic algorithm (NSGA-II), while the second uses a dynamic weighted optimization genetic algorithm. The developed scheduling and optimization methods are coded in python as a stand-alone automated computerized tool to facilitate the developed method's application. Findings: The developed method is applied to a numerical example to demonstrate its use and illustrate its capabilities. The method was validated using a multi-layered comparative analysis that involves performance evaluation, statistical comparisons and stability evaluation. Results indicated that NSGA-II outperformed the weighted optimization method, resulting in a better global optimum solution, which avoided local minima entrapment. Moreover, the developed method was constructed under a deterministic scenario to evaluate its performance in finding optimal solutions against the previously developed literature methods. Results showed the developed method's superiority in finding a better optimal set of solutions in a reasonable processing time. Originality/value: The novelty of the proposed method lies in its capacity to consider resource planning and project scheduling under uncertainty simultaneously while accounting for activity splitting.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | fuzzy set theory; nsga-ii; resource-constrained scheduling under uncertainty; schedule optimization |
| Index terms: | genetic algorithm, scheduling, project scheduling, comparative analysis, stability, methodology, performance evaluation, schedule compression, accounting, fuzzy set theory, module, duration, modelling, resource planning |
| Subjects: | economic analysis, resource management, analytical methods, data analysis and analytics, operations research, algorithms, research methods, structural engineering, performance measurement, architectural elements, decision-making and optimization, project controls |
| Topics: | Digital Applications, Design Practice, Quality Management, Site Management, Time Control, Business Strategy, Engineering Principles, Research Practice |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here