Characterisation of the drivers of environmental management system implementation

Oladinrin, O T and Ojo, L D (2022) Characterisation of the drivers of environmental management system implementation. Engineering, Construction and Architectural Management, 29(10), pp. 3868-3892. ISSN 0969-9988

Abstract

Purpose: The detrimental impacts of the construction industry activities, namely, toxicity of cement and concrete to the health of construction workers and the general public, have been reported in previous studies. Several environmental management measures were put in place by international organisations to reduce these impacts on humans and the entire ecosystem. Sadly, such environmental management measures are not widely embraced in the construction industry of developing countries. This contributes to the poor quality of life of construction stakeholders, amongst other outcomes. Therefore, this study investigated the drivers to facilitate an environmental management system (EMS) in the Nigerian construction industry (NCI). Design/methodology/approach: questionnaires retrieved from construction professionals in the micro, small, medium and large enterprises were used to conduct both descriptive and inferential statistics, namely, mean score, standard deviation, Kruskal–Wallis H test, post hoc test and factor analysis. Findings: The analyses show that the drivers of EMS implementation in the NCI could be grouped into intellectual enhancement strategies, documentation and cultural strategies, and motivation and tracking strategies. The study concluded that training and education of relevant stakeholders, tracking compliance levels of organisations and recognising firms acting in compliance with stipulated “environmental” policy are essential. It was recommended that the collaboration of all construction stakeholders be upheld to aid EMS implementation in the NCI. Originality/value: This paper investigated the drivers of EMS with the opinions of construction professionals in the mainstream of the NCI through survey using to ensure wide coverage of respondents. Investigating the view of construction professionals in the micro, small, medium and large enterprises helped determine possible significant differences. Thus, practical implications of the study were also provided in a systematic manner.

Item Type: Article
Uncontrolled Keywords: construction industry; drivers; environmental management system; Nigeria; sustainability
Index terms: collaboration, methodology, questionnaire, strategy, quality of life, motivation, documentation, survey, environmental management system, developing country, compliance, statistics, construction worker, implementation, construction industry, environmental management, construction professional, factor analysis, deviation, Nigeria, international organization
Subjects: health safety and environment, Geography, professional development, development economics, management, sustainability assessment, research methods, public and environmental health, industry analysis, statistical analysis, practitioner, control systems, data collection methods, strategic management, mathematical modelling, contractual arrangements, financial and cost management, psychology
Topics: Organizational Design, International Construction, Human Resources, Sustainability, Procurement, Roles and Professions, Information Management, Geographical Context, Research Practice, Health and Safety, Business Strategy, Cost Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here