Response of contractor behavior to hierarchical governance: Effects on the performance of mega-projects

Yin, H; Wang, D; Yin, Y; Liu, H and Deng, B (2022) Response of contractor behavior to hierarchical governance: Effects on the performance of mega-projects. Engineering, Construction and Architectural Management, 29(4), pp. 1661-1677. ISSN 0969-9988

Abstract

Purpose: This study aims to examine the impacts of formal and informal hierarchical governances (HGs) on the performance of mega-projects and the mediating role of contractor behavior (i.e. perfunctory and consummate behaviors) in these relationships. Design/methodology/approach: A total of 375 valid data entries from managers representing 375 mega-projects were analyzed through path analysis. Findings: Both formal and informal HGs exert positive effects on the performance of mega-projects. While formal HG positively affects contractor perfunctory behavior and contractor consummate behavior, informal HG affects contractor perfunctory behavior only. Contractor behavior mediates the relationship between formal HG and project performance. Research limitations/implications: The impacts of potential moderators (e.g. institutional arrangement and complexity) on the relationship between HG and contractor behavior have not been considered in this study. Practical implications: This study is useful for owners to enhance formal HG to improve contractor perfunctory and consummate behaviors, which in turn can enhance the performance of mega-projects. Originality/value: This study expands the knowledge of mega-project performance management from the perspective of HG. It also contributes to the literature of contractor behavior within the context of mega-projects.

Item Type: Article
Uncontrolled Keywords: contractor behavior; general contractor; hierarchical governance; mega-project; performance
Index terms: manager, general contractor, methodology, complexity, governance, owner, project performance, path analysis
Subjects: practitioner, business, project management theory and practice, research methods, systems engineering, statistical analysis, sociology
Topics: Stakeholder Management, Roles and Professions, Governance, Research Practice, Project Management, Engineering Principles
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here