An analysis of building procurement factors affecting coordination of building services

Lam, K C; Gibb, A G F and Sher, W D (1997) An analysis of building procurement factors affecting coordination of building services. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Abstract

the procurement of complex and highly serviced buildings is always fraught with expensive and complex problems of inadequate coordination of building services. These problems are detrimental to the success of building projects, and must be resolved by rational and professional management from design to construction. Preliminary results of our research study have indicated that the success of complex coordination of building services is dependent on the appropriateness of a particular procurement system for a particular project. This paper presents two models which can be used for managing the coordination of building services and in the selection of an appropriate procurement path with due regard to the coordination of complex building services.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: services coordination; coordination model; coordination procurement model; proposition; case studies
Index terms: building service, procurement system, case study, coordination, building procurement
Subjects: contractual arrangements, management, data collection methods, engineering systems
Topics: Research Practice, Organizational Design, Engineering Principles, Procurement
Descriptive scope: 2 CE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here