Ranked generic criteria for EPC contractor selection

Dissanayake, N; Xia, B; Skitmore, M; Trigunarsyah, B and Menadue, V (2023) Ranked generic criteria for EPC contractor selection. Engineering, Construction and Architectural Management, 30(10), pp. 4933-4954. ISSN 0969-9988

Abstract

Purpose: The purpose of this study was to prioritize the appropriate generic contractor selection criteria for Engineering–Procurement–Construction (EPC) projects in the construction industry. Design/methodology/approach: Proceeding from a review of previous studies and validation by a small group of experts, a preliminary set of 16 criteria was first identified. This was followed by three rounds of Delphi surveys: firstly, with 64 experienced participants confirming the relevance of the 16 criteria; secondly, with a reduced subgroup of 47 more experienced participants scoring the importance of each; and finally, providing the opportunity for these 47 to revise their scores in the light of knowing the aggregated results of the previous round. Findings: The results show the consensus view, of which the most important criteria are ranked as past performance, project understanding, technical attributes, key personnel, health and safety, past experience, time, management, financial, contractual and legal, quality, cost, relationships, environmental and sustainability, organizational and industrial relations, and geographic location. Originality/value: The findings are useful for both practitioners and academics in making a significant contribution to the body of knowledge of the EPC process. This will assist in providing a better understanding of criteria importance and pave the way to developing an EPC contractor selection model involving the criteria most needed to objectively identify potential contractors and evaluate tenders.

Item Type: Article
Uncontrolled Keywords: contractor; criteria; epc projects; selection; tender
Index terms: subgroup, contractor selection, industrial relation, Delphi survey, construction industry, personnel, health and safety, body of knowledge, methodology, validation, practitioner
Subjects: practitioner, data collection methods, knowledge management, psychology, professional development, health safety and environment, research methods, tendering, management, industry analysis, research management
Topics: Organizational Design, Human Resources, Procurement, Roles and Professions, Information Management, Research Practice, Health and Safety
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here