Macedo, B S and Ferreira, M L R (2023) Welder learning curves behaviour: "Focus on welding productivity with the tig process of marine platforms stainless steel pipes". Engineering, Construction and Architectural Management, 30(2), pp. 496-513. ISSN 0969-9988
Abstract
Purpose: The purpose of the study is to analyse the feasibility of using the potential and exponential curve models to assess the learning of a group of welders, when welding stainless steel piping with the tungsten inert gas process. Design/methodology/approach: The welding productivity data grouped according to the requirements of the ASME SECTION IX code is organised into two groups: average productivity and baseline productivity. When processing the adjustment to the two models, the Excel software Solver tool was used. The criteria for assessing the quality of the fit were: least squared method, Spearman's correlation coefficient and graphical method. The impact of the variation coefficient on the average productivity and the amplitude (difference between the minimum and maximum productivity) was also evaluated on the baseline productivity. Findings: The curves elaborated based on the average productivity presented better quality of adjustment than those constructed from the baseline productivity. The potential and exponential models presented similar adjustment conditions, with the second having a slightly superior performance. There were no productivity gains due to learning in the studied time interval. The grouping of the average daily productivity data based on the diameter range established in the ASME code section IX presented satisfactory results, enabling its use by the industry. Originality/value: There is no news of work on piping welding with this focus. The proposal to group the productivity data according to the degree of difficulty of execution established by the ASME code section IX, widely used in the industry, is a significant contribution to monitoring the evolution of learning. In the same way, the results allow to adopt the average productivity determined from the first 20 days of realisation of a project, as a reasonable indicator to estimate the future performance of the work, helping to correct deadlines during the realisation of a project.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction; estimating; learning curve; productivity; welding productivity |
| Index terms: | estimating, methodology, evolution, variation, proposal, welder, estimate, monitoring, productivity, platform |
| Subjects: | research methods, management, digital design, contractual condition, control systems, practitioner, financial and cost management, environmental science, project planning |
| Topics: | Business Strategy, Cost Management, Research Practice, Project Management, Roles and Professions, Sustainability, Digital Applications, Contract Administration, Site Management |
| Descriptive scope: | 3 PCT |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here