Mark-up on construction projects: what have we learnt in the last 20 years?

Oo, B L; Lim, B T H and Runeson, G (2023) Mark-up on construction projects: what have we learnt in the last 20 years? Engineering, Construction and Architectural Management, 30(9), pp. 4319-4338. ISSN 0969-9988

Abstract

Purpose: With the aim to provide a global view of factors affecting mark-up size on construction projects, this study performs a meta-analytical review of the relevant studies over the past 20 years. Design/methodology/approach: The analytical process involved the identification and evaluation of the importance of critical factors affecting mark-up size on construction projects, and the assessment of the generalisability of findings of the meta-analysis. A random-effects model was adopted in the statistical meta-analysis. Findings: The results show that there are 23 critical factors, and the top five factors are: (1) competitiveness of other bidders; (2) number of bidders; (3) relationship and past experience with client; (4) experience on similar project; and (5) project size. A heterogeneity test further shows that there is no statistically significant heterogeneity across the studies, reinforcing the generalisability of the findings to a global context. Research limitations/implications: The list of critical factors from a global perspective should form a good basis for future efforts in bidding model development. Practical implications: The research findings have practical implications to both construction clients and contractors in formulating their contracting practices and strategies. Originality/value: This is the first meta-analysis of a sizeable collection of replicated studies on factors affecting mark-up size on construction projects in the literature.

Item Type: Article
Uncontrolled Keywords: construction project; factor; global; mark-up; meta-analysis
Index terms: bidding, model development, methodology, construction project, strategy, meta-analysis, number of bidders, mark-up, competitiveness, bidder, construction client, critical factor
Subjects: bidding, analytical methods, practitioner, risk assessment, price determination, market analysis, research evaluation and metrics, production management, management, research methods
Topics: Project Management, Research Practice, Engineering Principles, Business Strategy, Procurement, Roles and Professions, Risk Management
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here