Project management for the construction industry: An examination of a systems approach

Moore, T A and Moore, D R (1997) Project management for the construction industry: An examination of a systems approach. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Abstract

This paper focuses upon the effects of environmental sub-systems on a described hypothetical construction project. An evaluation model is applied to the project and examines the manner in which subsystems within the project determine the extent of openness required by an organisation structure suitable for the project. Construction projects in general must have a high degree of openness due to the need to respond to a range of environmental forces which are external to the project. From this position the paper suggests that organisation structure design for construction projects should emphasise flexibility, even though this may not result in an efficient structure.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: production systems; environmental sub-systems; environment classification continuums; organisation structures
Index terms: construction project, construction industry, project management, production system
Subjects: industry analysis, manufacturing engineering, production management, project management theory and practice
Topics: Research Practice, Project Management, Engineering Principles
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here