Modeling cost overrun in building construction projects using the interpretive structural modeling approach: A developing country perspective

Shoar, S; Yiu, T W; Payan, S and Parchamijalal, M (2023) Modeling cost overrun in building construction projects using the interpretive structural modeling approach: A developing country perspective. Engineering, Construction and Architectural Management, 30(2), pp. 365-392. ISSN 0969-9988

Abstract

Purpose: Although several studies have been conducted on the causes of cost overrun, they have mainly assumed that the causes of cost overrun are independent of each other, and few of them scrutinized the complex interrelationships between the causes. To fill the gap, this study aims to investigate the mutual interactions between the causes of cost overrun using interpretive structural modeling (ISM) and proposing strategies to tackle the causes considering their interactions. Design/methodology/approach: Critical causes of cost overrun were identified through a comprehensive literature review. In total, 22 key causes are then refined based on the opinions of relevant experts involved in the Iranian building and construction sector. Using the nominal group technique, the causes' interactions were examined and represented via the ISM diagram. The causes were also classified using “matrix cross-reference multiplication applied to a classification (MICMAC)” technique. Findings: The results showed that price fluctuation, claims, execution delay, delay in payment and change order positioned at the highest level of the obtained model can directly result in cost overrun, and corruption and poor contract management located at the base of the model are two major root causes of cost overruns. It was also concluded that more attention should be paid to the precontract phase of the project to address and prevent corruption and managerial issues deeply rooted in this stage. Originality/value: The findings of this study provide a clear understanding of how different causes of cost overrun are related to each other and can ultimately assist project managers of different parties in choosing strategies to mitigate cost overrun in building construction projects.

Item Type: Article
Uncontrolled Keywords: building projects; cost overrun; developing countries; Iran; ism method
Index terms: change order, cost overrun, project manager, construction sector, modelling, interaction, methodology, interpretive structural modelling, contract management, corruption, literature review, developing country, strategy, building construction
Subjects: management, analytical methods, contractual condition, research methods, building construction, professional ethics, data analysis and analytics, profession, behavioral psychology, financial and cost management, development economics, contract management, industry analysis
Topics: Legal Issues, Contract Administration, Roles and Professions, Cost Management, Construction Technology, Research Practice, Business Strategy, International Construction, Engineering Principles
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here