Zaman, U; Florez-Perez, L; Anjam, M; Ghani Khwaja, M and Ul-Huda, N (2023) At the end of the world, turn left: Examining toxic leadership, team silence and success in mega construction projects. Engineering, Construction and Architectural Management, 30(6), pp. 2436-2462. ISSN 0969-9988
Abstract
Purpose: Failures in both followership and leadership become inevitable as mega construction projects are directed and controlled by toxic leaders. Consequently, team member's desire for knowledge hoarding silence is triggered and goal alignment between the leader and team members suddenly fades away to realize success in mega projects. Considering the growing importance of these rarely examined constructs and fragmented literature on toxic leadership (TL), team silence and mega project success (PS) in the global construction industry, the present study aimed to examine the effects of TL and project team member's silence (PTMS) on the success of mega construction projects. Moreover, the mediating influence of PTMS to link TL and mega construction PS has also been explored. Design/methodology/approach: Drawing on survey data of 326 project professionals directly associated with mega construction projects worth US$62bn under the China–Pakistan Economic Corridor (CPEC), the conceptual model was tested with covariance-based structural equation modeling (CB-SEM) using Mplus program. Scales were adapted from previous research to measure TL (with its five-dimensions including abusive supervision, authoritarian leadership, self-promotion, narcissism and unpredictability), PS (with its three-dimensions including project management success, project ownership success and project investment success) and project team members' silence. Reflective–formative second order assessments were specifically applied to measure the multi-dimensional nature of TL and PS, respectively. Findings: Mplus estimations revealed that TL negatively influences PS, besides forcing a culture of silence among project team members. Interestingly, the relationship between TL and PS is also negatively mediated by the PTMS. Research limitations/implications: The present study's findings are derived from data of project professionals (N = 326) to examine success in megaprojects under the CPEC. Hence, these findings may be re-validated through future studies on similar megaprojects (e.g. China's Belt and Road Initiative (BRI) worth US$8tn) that may also be predicated by TL tendencies, silent cultures and high-stakes involved to seize PS. Practical implications: Policymakers, construction practitioners and other key stakeholders (e.g. departmental heads/supervisors) can take advantage of this new evidence to better interpret the success paradox in mega projects, and to reduce the spread and long-term damage of TL on team members and eventually create opportunities for PS. Originality/value: The present study's novelty is manifested within this first empirical evidence on TL that breeds team silence in underperforming mega projects. Notably, present study offers alarming evidence on mega projects that can be easily derailed from success, as they continue to suffer from team silence and TL.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | mega construction projects; project success; project team member's silence; toxic leadership |
| Index terms: | survey, construction practitioner, drawing, structural equation modelling, evidence, methodology, construction project, program, Pakistan, megaproject, paradox, China, project success, promotion, estimation, ownership, global construction, project team, future study, project management, supervision, dimension, supervisor |
| Subjects: | statistical analysis, economics, software systems, research methods, management, project management theory and practice, professional development, Geography, production management, technical documentation, health monitoring assessment and metrics, project delivery, financial and cost management, strategic project management, social theory and frameworks, research design and methodology, strategic management, evaluation and assessment methods, data collection methods, control systems, practitioner |
| Topics: | International Construction, Human Resources, Digital Applications, Design Practice, Organizational Design, Information Management, Project Management, Geographical Context, Research Practice, Health and Safety, Cost Management, Roles and Professions |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here