Analysis on risk factors related delay in pcps

Zhao, Y; Chen, W; Yang, Z; Li, Z and Wang, Y (2023) Analysis on risk factors related delay in pcps. Engineering, Construction and Architectural Management, 30(10), pp. 4609-4644. ISSN 0969-9988

Abstract

Purpose: Risk factors related delay hinder the schedule performance of most construction projects in the world. It is a critical challenge to realize the advantages of prefabricated construction projects (PCPs) under the negative effect of schedule delay. This paper aims to propose an exhaustive list of risk factors impeding the progress of PCPs and evaluate the collected risk factors based on the cause–effect relations. The ultimate goal is to improve the understanding of the complex relations among various risk factors related delay in PCPs, and also offer managers a reference on aspect of schedule risk management. Design/methodology/approach: This paper proposes a hybrid method of GT–DEMATEL–ISM, that is combing grounded theory, DEMATEL (decision-making trial and evaluation laboratory) and ISM (Interpretative Structural Modeling), to collect, evaluate and structure risk factors related delay for PCPs. The research procedure of this methodology is divided into three stages systematically involving qualitative and quantitative analysis. In the first stage, GT is utilized to implement qualitative analysis to collect the risk factors leading to schedule delay in PCPs. While, the quantitative analysis is to analyze and evaluate the collected risk factors based on the cause–effect relations in the next two stages evaluation by the DEMATEL focuses on quantifying the priority and intensity of the relations between factors. Additionally, ISM is employed to construct the hierarchical structure and graphically represent the pairwise relations between factors. Findings: The outcome of qualitative investigation by grounded theory proposes a theoretical framework of risk factors related delay for PCPs. The framework contains three levels of category, namely, core category, main category and initial category and provides a list of risk factors related delay. Following this finding, evaluation results by the DEMATEL classify factors into cause and effect groups and determine 11 critical delay risk factors. Meanwhile, the findings show that risks referring to organizational management issue foremost impact the progress of PCPs. Furthermore, a systemic multilevel hierarchical structure model is visually constructed by ISM to present the pairwise linkages of critical factors. The model provides the risk transmission chains to map the spread path of delay impact in the system. Originality/value: The contribution of the study involves twofold issues. Methodologically, this research proposes a hybrid method GT–DEMATEL–ISM used to identify and analyze factors for a complex system. It is also applicable to other fields facing similar problems that require collecting, evaluating and structuring certain elements as a whole in a comprehensive perspective. The theoretical contribution is to fill the relevant research gap of the existing body of knowledge. To the best knowledge of the authors, this paper is the first attempt to integrate qualitative and quantitative research for risk analysis related delay and take the insight into the whole process of PCPs covering off-site manufacture and on-site construction. Furthermore, the analysis of findings provided both a micro view focusing on individual risk factor and a managerial view from a systematic level. The findings also contribute the effective information to improve the risk management related schedule delay in PCPs.

Item Type: Article
Uncontrolled Keywords: delay; dematel; grounded theory; ism; pcps; risk factor
Index terms: organizational management, manager, laboratory, schedule performance, body of knowledge, quantitative analysis, risk analysis, methodology, decision-making, construction project, qualitative analysis, linkage, grounded theory, critical factor, complex system, schedule delay, quantitative research, structural modelling, risk factor, risk management, investigation
Subjects: research methods, theoretical framing, production management, decision analysis, research management, project controls, systems engineering, environmental hazards, research design and methodology, business, risk assessment, data collection methods, practitioner, analytical methods, data analysis and analytics, knowledge management
Topics: Time Control, Organizational Design, Information Management, Engineering Principles, Research Practice, Project Management, Business Strategy, Sustainability, Risk Management, Roles and Professions
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here