Alkilani, S and Loosemore, M (2024) An investigation of how stakeholders influence construction project performance: A small and medium sized contractor's perspective in the Jordanian construction industry. Engineering, Construction and Architectural Management, 31(3), pp. 1272-1297. ISSN 0969-9988
Abstract
Purpose: This research uses contingency theory and Venkatraman’s concept of moderating fit to explore how key project stakeholders (clients, consultants and suppliers) influence project performance from the perspective of small and medium contractors in the Jordanian construction industry. Design/methodology/approach: An anonymous structured survey was performed comprising 200 key informants including senior project managers, construction managers, engineers and general managers working for small- and medium-sized contractors in the Jordanian construction industry. The Partial Least Squares Structural Equation Modelling (PLS-SEM) was used to analyse the data. Findings: The results of this study show that consultant-related factors (quality of documentation produced, ability to communicate and technical competencies) are perceived to have the most significant direct effect on project performance, followed by client-related factors (payment promptness, decision certainty and documentation control) and supplier-related factors (supplier performance, defects control and logistics management). Originality/value: The results contribute new theoretical, empirical and practical insights to existing construction project performance research by highlighting the key performance factors which need to be managed for each stakeholder group to ensure effective project performance from a small- and medium-sized contractor perspective.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | collaboration; contingency theory; developing countries; moderating fit; project performance; small- and medium-sized contractors |
| Index terms: | logistics management, construction industry, investigation, project performance, contingency theory, engineer, project manager, direct effect, partial least square, project stakeholder, construction manager, methodology, collaboration, construction project, survey, documentation, structural equation modelling, manager, developing country |
| Subjects: | practitioner, data collection methods, profession, statistical analysis, industry analysis, sociology, development economics, professional development, project management theory and practice, production management, supply chain operations, research methods, management, factor and component analysis |
| Topics: | Information Management, Research Practice, Project Management, Stakeholder Management, Roles and Professions, Supply Chain Management, International Construction, Organizational Design |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here