Modeling for external stakeholder risk assessment of project portfolios

Bai, L; Kang, S; Zhang, K; Zhang, B and Pan, T (2024) Modeling for external stakeholder risk assessment of project portfolios. Engineering, Construction and Architectural Management, 31(2), pp. 737-766. ISSN 0969-9988

Abstract

Purpose: External stakeholder risks (ESRs) caused by unfavorable behaviors hinder the success of project portfolios (PPs). However, due to complex project dependency and numerous risk causality in PPs, assessing ESRs is difficult. This research aims to solve this problem by developing an ESR-PP two-layer fuzzy Bayesian network (FBN) model. Design/methodology/approach: A two-layer FBN model for evaluating ESRs with risk causality and project dependency is proposed. The directed acyclic graph (DAG) of an ESR-PP network is first constructed, and the conditional probability tables (CPTs) of the two-layer network are further presented. Next, based on the fuzzy Bayesian network, key variables and the impact of ESRs are assessed and analyzed by using GeNIe2.3. Finally, a numerical example is used to demonstrate and verify the application of the proposed model. Findings: The proposed model is a useable and effective approach for ESR assessment while considering risk causality and project dependency in PPs. The impact of ESRs on PP can be calculated to determine whether to control risk, and the most critical and heavily contributing risks and project(s) in the developed model are identified based on this. Originality/value: This study extends prior research on PP risk in terms of stakeholders. ESRs that have received limited attention in the past are explored from an interaction perspective in the PP domain. A new two-layer FBN model considering risk causality and project dependency is proposed, which can synthesize different dependencies between projects.

Item Type: Article
Uncontrolled Keywords: external stakeholder risk assessment; fuzzy Bayesian network; project portfolio; two-layer network
Index terms: bayesian network, risk assessment, complex project, interaction, modelling, methodology, external stakeholder
Subjects: analytical methods, strategic project management, financial risk, research methods, behavioral psychology, probabilistic model, sociology
Topics: Research Practice, Project Management, Engineering Principles, Cost Management, Stakeholder Management, Digital Applications
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here