Liu, J; Wang, Z; Tang, J and Song, J (2024) The impact of the institutional environment of the host country on the perception of compliance risk of the international engineering contractor: The moderating effect of absorptive capacity. Engineering, Construction and Architectural Management, 31(2), pp. 716-736. ISSN 0969-9988
Abstract
Purpose: While there is a general belief that a defective institutional environment will lead to higher compliance risk, the current state of knowledge about how the institutional environment affects enterprises' compliance is equivocal. This study aims to explore how does the host country's institutional environment affect the compliance risk perception of international engineering contractors and how to mitigate this impact. Design/methodology/approach: This study empirically tests the impact of the institutional environment from the two dimensions of the institutional environment: legal completeness reflects whether the formal regulations are clear, detailed and comprehensive and legal effectiveness reflects whether rules and policies can be implemented effectively when the proper legal codes are provided. Based on 213 questionnaire data, this study uses partial least squares structural equation model (PLS-SEM) and Smart PLS software to test the hypothesis. Findings: This study finds a negative relationship between the host country's legal completeness (LC) or legal effectiveness (LE) and a contractor's compliance risk perception. Further, the results show potential absorptive capacity (PAC) and realized absorptive capacity (RAC) of a contractor are critical for mitigating the impact of low LC in the host country, but not when LE is low. Practical implications: The findings will be useful for international engineering contractors to respond to the compliance risk of the host country, both in choices of overseas investment locations and compliance capacity building. Originality/value: This study reveals the impact of the host country's institutional environment on the compliance risk perception of international contractors, and provides theoretical guidance for how to alleviate the compliance barriers brought by the host country's institutional environment to international engineering contractors.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | compliance risk perception; legal completeness; legal effectiveness; potential absorptive capacity; realized absorptive capacity |
| Index terms: | capacity building, dimension, engineering contractor, effectiveness, structural equation model, risk perception, compliance, absorptive capacity, partial least square, methodology, regulation, questionnaire |
| Subjects: | research methods, performance management, theoretical framing, health safety and environment, firms, environmental hazards, political science, statistical analysis, data collection methods, social and economic development, health monitoring assessment and metrics |
| Topics: | Governance, Sustainability, Roles and Professions, Research Practice, Health and Safety, Human Resources, Quality Management |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here