Ma, T and Liu, Y (2024) Multiple paths to enhancing the resilience of project-based organizations from the perspective of CSR configuration: Evidence from the Chinese construction industry. Engineering, Construction and Architectural Management, 31(2), pp. 835-865. ISSN 0969-9988
Abstract
Purpose: The role of corporate social responsibility (CSR) fulfillment is critical when building resilience of project-based organizations (PBOs). However, fulfilling CSR to build a highly resilient PBO remains a black box problem. This study explores the different CSR combinations that enhance PBO resilience. Design/methodology/approach: This study defines CSR in terms of shareholder, employee, and social CSR, and analyzes corporate characteristics in terms of corporate scale and nature. Data are collected from Hexun.com and the China Stock Market and Accounting Research Database (CSMAR). The qualitative comparative analysis (QCA) method is used to analyze 48 listed construction and engineering companies from China to explore the CSR configurations for PBOs in enhancing organizational resilience. Findings: A large firm size is a necessary condition for high organizational resilience. We find six paths to build high and non-high resilience in PBOs, and the driving mechanisms of high and non-high resilience exhibit an asymmetric relationship. Research limitations/implications: This study cracks the black box of CSR fulfillment and PBO resilience. It reveals the CSR configurations that enhance or inhibit the resilience of PBOs. It also provides scientific basis for PBOs in their fulfillment of CSR in response to crises, and the enhancement of organizational resilience. Future research can be expanded to other industries, as the study sample is only limited to civil engineering construction companies. Since this study uses cross-sectional data, time series can be introduced in the future to further explore the relationship between CSR and organizational resilience. Practical implications: This study provides targeted suggestions that can help decision-makers of construction companies to determine how they can fulfill CSR to enhance organizational resilience. At the same time, it can provide intellectual support for PBOs to cope with systemic crises and promote the fulfillment of CSR. Originality/value: In terms of theoretical value, on the one hand, this study verifies the relationship between CSR fulfillment and PBO resilience, revealing its mechanism of action and multiple paths; on the other hand, it provides a new way of thinking for management research methods and enriches the theoretical study of organizational resilience.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | corporate social responsibility; fuzzy-set qualitative comparative analysis; organizational resilience; project-based organizations |
| Index terms: | database, corporate social responsibility, construction industry, organizational resilience, time series, management research, qualitative comparative analysis, construction company, project-based organization, methodology, configuration, evidence, accounting, China |
| Subjects: | evaluation and assessment methods, business, research design and methodology, organization, data science, economic analysis, health safety and environment, Geography, research methods, industry analysis, systems engineering, data management |
| Topics: | Digital Applications, Organizational Design, Research Practice, Geographical Context, Engineering Principles, Business Strategy, Health and Safety |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here