Water environment treatment ppp projects optimal payment mechanism based on multi-stage dynamic programming model

Su, L; Cao, Y; Li, H and Zhang, C (2024) Water environment treatment ppp projects optimal payment mechanism based on multi-stage dynamic programming model. Engineering, Construction and Architectural Management, 31(2), pp. 866-890. ISSN 0969-9988

Abstract

Purpose: The optimal payment in the whole operation and maintenance period of water environment treatment PPP projects has become the main approach to realize sustainable development of projects. This study is aimed at constructing an effective payment model for the whole life period of projects to achieve win-win among all stakeholders, so as to provide a theoretical reference and managerial implications for the public sector in the whole operation and maintenance period. Design/methodology/approach: In the whole operation and maintenance period of water environment treatment PPP projects, this article investigates how the public sector optimizes the payment in the whole operation and maintenance period of projects. Firstly, the projects' whole operation and maintenance period is divided into several stages according to the performance appraisal period. And then, the multi-stage dynamic programming model is constructed to design the payment construct model for the public sector in each performance appraisal stage. The payment from the public sector is the decision variable, and the deduction from the private sector is a random variable. Findings: The optimal payment model showed that the relatively less objective weight of public sector leaded to its relatively more total payment and vice versa. Therefore, the sustainable development of the projects can only be ensured when the objective weights both of them should be balanced. Additionally, the deduction from the performance appraisal of private sector plays an important role in the model construction. The larger deduction the private sector undertakes, the smaller profits private sector has. Since the deduction at each stage is a random variable, the deduction varies with the different probability distributions obeyed by the practical deduction in each stage. Research limitations/implications: The findings from this study have provided theoretical and application references, and some managerial implications are also given. First, the improvement of the pricing system of public sector should be accelerated. Second, the reasonable profit of the private sector must be guaranteed. While pursuing the maximization of social benefits, the public sector should make full use of the price sharing mechanism in the market and supervise the real income situation of the private sector. Third is increasing the public to participate in pricing. Additionally, it is a limitation that the deduction is assumed to conform to a uniform distribution in this study. Other probability distributions on deduction can be essentially further sought, so as to be more line with the actual situation of the projects. Originality/value: The optimal payment in whole operation and maintenance period of the projects has become an important issue, which is a key to project success. This study constructs a multi-stage dynamic programming model to optimize payment in the whole period of projects. Additionally, this study adds its value through deeply developing the new theories of optimal payment to more suitable for the practical problems, so that to optimize the design of payment mechanism. Meanwhile, a valuable reference for public and private sectors is provided to ensure the sustainable development of the projects.

Item Type: Article
Uncontrolled Keywords: incentive contract; multi-objective optimization; payment mechanism; PPPs; pricing
Index terms: appraisal, methodology, maximization, profit, incentive contract, sustainable development, operation and maintenance, social benefit, payment mechanism, dynamic programming, multi-objective optimization, income, probability distribution, public sector, private sector, pricing, project success
Subjects: economic analysis, contractual arrangements, statistical analysis, industry analysis, administrative law, maintenance engineering, research methods, algorithms, factor and component analysis, theoretical framing, project management theory and practice, health safety and environment
Topics: Digital Applications, Legal Issues, Project Management, Research Practice, Health and Safety, Business Strategy, Procurement
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here