Exploring mega-construction project success in China's vaunted belt and road initiative: The role of paternalistic leadership, team members' voice and team resilience

Yunpeng, G and Zaman, U (2024) Exploring mega-construction project success in China's vaunted belt and road initiative: The role of paternalistic leadership, team members' voice and team resilience. Engineering, Construction and Architectural Management, 31(9), pp. 3801-3825. ISSN 0969-9988

Abstract

Purpose: The traditional Chinese culture has always emphasized the authority of leaders and their "top-down" influence over subordinates tangled with "bottom-up" management. Paternalistic leadership can both nurture and restrict growth in mega-construction projects, due to the unique consequences (i.e. positive vs negative implications) for project teams. Hence, the present study aimed to explore the impact of paternalistic leadership (PL), team members' voice (TMV) and team resilience (TR) on the mega-construction project success (MPS) in China's Belt and Road Initiative (BRI). Design/methodology/approach: A surveyed-based sample of project professionals (N = 563) directly linked with the BRI was employed for statistical estimations with partial least squares (PLS) structural equation modeling (SEM). Findings: Paternalistic leadership styles, including authoritarian leadership (AL), moral leadership (ML) and benevolent leadership (BL), significantly influence the mega-construction project success in BRI. The findings empirically validated that both BL and ML increase the likelihood of mega-construction project success. However, AL could impose a threat through its underlying negative influence. In addition, leaders with benevolence and morality have a positive influence on TMV and TR, while leaders with authoritarianism signal a negative impact. Furthermore, both TMV and TR significantly and positively mediate the relationships between AL-MPS (Model-1), BL-MPS (Model-2) and ML-MPS (Model-3), respectively. Originality/value: The present study is a groundbreaking endeavor that fills a crucial research gap by investigating mega-construction project success in the BRI through paternalistic leadership, project team members' voice and team resilience in a multi-mediation model. These novel findings offer valuable strategic insights for managing mega-construction projects in countries with paternalistic solid cultural foundations, enabling project managers to navigate cultural nuances and optimize megaproject outcomes.

Item Type: Article
Uncontrolled Keywords: belt and road initiative; leader–member exchange theory; mega-construction project success; paternalistic leadership; social exchange theory; team members' voice; team resilience; questionaire survey
Index terms: project team, foundations, social exchange theory, morality, estimation, project manager, megaproject, partial least square, China, construction project, methodology, leadership style, survey, structural equation modelling, mediation
Subjects: ethical practice, financial and cost management, project delivery, strategic project management, profession, data collection methods, dispute resolution, leadership, statistical analysis, structural engineering, research methods, Geography, production management, social theory
Topics: Roles and Professions, Cost Management, Engineering Principles, Project Management, Geographical Context, Research Practice, Organizational Design, Legal Issues
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here