Understanding the low adoption of prefabrication prefinished volumetric construction (ppvc) among SMEs in Singapore: From a change management perspective

Shang, G; Pheng, L S and Gina, O L T (2021) Understanding the low adoption of prefabrication prefinished volumetric construction (ppvc) among SMEs in Singapore: From a change management perspective. International Journal of Building Pathology and Adaptation, 39(5), pp. 685-701. ISSN 23984708

Abstract

Purpose: Construction productivity issues have constantly surfaced in Singapore's construction industry. To push for productivity, the Government has implemented various initiatives to encourage industry players, particularly small and medium enterprises (SMEs), and to adopt more productive construction technologies. One of these technologies is prefabrication prefinished volumetric construction (PPVC), a concept of the design for manufacturing and assembly (DfMA) approach. This exploratory study sheds lights on PPVC adoption and its issues in Singapore in the context of the launch of the Construction Industry Transformation Map (ITM). Design/methodology/approach: The methodology used here is mainly a quantitative approach in the form of a survey. A questionnaire was developed and distributed to a pool of about 100 contractors, randomly chosen as part of a stratified sample. The questionnaire survey helps gain further insights into the industry's perceptions of PPVC and its adoption. Findings: The study succeeded in identifying and analysing a list of drivers of and barriers to the adoption of PPVC. The top three most important potential drivers were “increase efficiency,” “technological change” and “changing nature of composition of workforce”. The three most important barriers were “ineffective on-site storage,” “high up-front payment” and “transportation issues”. Originality/value: This study also looked into the organizational change management theory. Various theories were considered to help understand and implement change. It is understood that it is not only important for an organization to focus on the steps of these frameworks and models when the change is initiated but also for the organization to acknowledge and be mindful of the emotions of employees and take measures to overcome their emotions as part of organizational change management.

Item Type: Article
Uncontrolled Keywords: change management theory; dfma; ppvc; Singapore; SMEs
Index terms: questionnaire, management theory, methodology, organizational change, survey, exploratory study, change management, technological change, construction technology, construction industry, prefabrication, construction productivity, efficiency, Singapore, transformation, productivity
Subjects: innovation studies, data collection methods, business, digital engineering, operations management, Geography, management, research methods, performance management, industry analysis, building construction
Topics: Project Management, Geographical Context, Research Practice, Business Strategy, Construction Technology, Quality Management, Digital Applications, Organizational Design
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here