Okafor, C C; Sydney Ani, U and Ugwu, O (2024) Critical solutions to the lapses of supply chain management in Nigeria's construction industry. International Journal of Building Pathology and Adaptation, 42(4), pp. 768-787. ISSN 23984708
Abstract
Purpose: Recent studies on construction supply chain management (CSCM) evaluated its vulnerability and challenging factors, but studies that have identified and examined the possible corrective measures of CSCM are rare. This study sets out to bridge this gap by identifying and evaluating the most effective CSCM corrective measures that will benefit the global construction industry. Design/methodology/approach: A methodology was designed to obtain the corrective measures of CSCM. Data were collected from 68 experts who served as research participants in this study, through a questionnaire survey and were analyzed statistically using the severity index analysis, Mann–Whitney test and factor analysis which includes KMO and Barlett's test, commonalities, total variance pattern matrix. Findings: The findings of the study revealed that free exchange of information between parties from both suppliers and site/firm is the best CSCM corrective measures, according to the research participant's opinion using the severity index analysis. Further analysis revealed seven underlying factors of CSCM corrective measures. Practical implications: The findings of this study have identified the most critical solutions to the lapses of CSCM. These will serve as adequate corrective measures to the challenges of CSCM and benefit the global construction industry. Originality/value: This study contributed seven underlying factors of CSCM corrective measures which can be adopted as adequate corrective measures to the lapses of CSCM. The study further contributed to CSCM research theory.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction industry; construction management; developing countries; supply chain management; questionaire survey |
| Index terms: | survey, developing country, methodology, questionnaire, vulnerability, Nigeria, variance, severity index, construction industry, global construction, factor analysis, construction supply chain |
| Subjects: | data collection methods, strategic management, construction logistics, measurement and scaling, environmental hazards, statistical analysis, industry analysis, research methods, development economics, Geography |
| Topics: | Research Practice, Geographical Context, Sustainability, Supply Chain Management, International Construction |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here