Higher hourly cost compensation for heavy equipment used in demolition activity

Shaurette, M (2015) Higher hourly cost compensation for heavy equipment used in demolition activity. International Journal of Construction Education and Research, 11(4), pp. 280-291. ISSN 1557-8771

Abstract

Demolition activity is increasingly dependent on heavy equipment as the primary means of dismantlement. This mechanized wrecking process qualifies as a severe working condition for the heavy equipment employed. Demolition practitioners note that the severe conditions encountered increase the operating cost of the equipment employed. There are occasions when unexpected project conditions or disaster response necessitate negotiated compensation for demolition services. In these negotiations, hourly cost references are utilized by contracting agencies to benchmark hourly billings. Supervising engineers recommend using the hourly values quoted in national cost references for standard construction services because no specific guidance for cost adjustment is provided by the cost reference guides. Because this cost differential is not recognized by supervising engineers, it is important that the magnitude of severe duty demolition equipment costs be brought to the attention of the engineering community. This manuscript introduces the problem, describes survey research, compares the research outcomes with known data, and presents possible variables to consider in application of the results. Results provide support for an incremental increase in reimbursement rates of from 10% to over 200%. This wide reimbursement range results from the complexity and variety of heavy equipment utilized and the specific hydraulic demolition tools employed.;  Demolition activity is increasingly dependent on heavy equipment as the primary means of dismantlement. This mechanized wrecking process qualifies as a severe working condition for the heavy equipment employed. Demolition practitioners note that the severe conditions encountered increase the operating cost of the equipment employed. There are occasions when unexpected project conditions or disaster response necessitate negotiated compensation for demolition services. In these negotiations, hourly cost references are utilized by contracting agencies to benchmark hourly billings. Supervising engineers recommend using the hourly values quoted in national cost references for standard construction services because no specific guidance for cost adjustment is provided by the cost reference guides. Because this cost differential is not recognized by supervising engineers, it is important that the magnitude of severe duty demolition equipment costs be brought to the attention of the engineering community. This manuscript introduces the problem, describes survey research, compares the research outcomes with known data, and presents possible variables to consider in application of the results. Results provide support for an incremental increase in reimbursement rates of from 10% to over 200%. This wide reimbursement range results from the complexity and variety of heavy equipment utilized and the specific hydraulic demolition tools employed.;

Item Type: Article
Uncontrolled Keywords: demolition; costs; payment; accounting; construction equipment; engineering; compensation; operating costs
Index terms: complexity, duty, accounting, agency, practitioner, survey, equipment cost, negotiation, compensation, hydraulic, operating cost, engineer, construction equipment, disaster response
Subjects: practitioner, dispute resolution, profession, contractual role, data collection methods, economic analysis, fluid mechanics, construction equipment, economics, systems engineering, conflict resolution, sociology, emergency and crisis management
Topics: Engineering Principles, Research Practice, Business Strategy, Cost Management, Plant and Equipment, Sustainability, Roles and Professions, Stakeholder Management, Legal Issues, Contract Administration
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here