Integrating BIM and panorama to create a semi-augmented-reality experience of a construction site

Gheisari, M; Foroughi Sabzevar, M; Chen, P and Irizzary, J (2016) Integrating BIM and panorama to create a semi-augmented-reality experience of a construction site. International Journal of Construction Education and Research, 12(4), pp. 303-316. ISSN 1557-8771

Abstract

A panorama is a continuous wide view of a real or virtual environment that provides the viewer with a natural feeling of being in such an environment. Panoramas can provide the visual backdrops and contexts for any augmented information such as audio, text, video, or 3D objects. This augmented panoramic environment can create an interactive space to provide information and bring the panorama to life. Having a panorama of a construction jobsite, and superimposing the building information models on it, would provide construction personnel with a simple way to access their required information in a natural and interactive environment. In this research, a workflow was developed to access building information augmented over the panoramic view of the real-world physical environment of the construction jobsite. A prototype was developed based on the created process and a user participation case study was conducted to test this system on a building renovation project. The results show that, an augmented panorama can provide a location-independent virtual reality experience, which is not significantly different from a pure-augmented-reality setting.;  A panorama is a continuous wide view of a real or virtual environment that provides the viewer with a natural feeling of being in such an environment. Panoramas can provide the visual backdrops and contexts for any augmented information such as audio, text, video, or 3D objects. This augmented panoramic environment can create an interactive space to provide information and bring the panorama to life. Having a panorama of a construction jobsite, and superimposing the building information models on it, would provide construction personnel with a simple way to access their required information in a natural and interactive environment. In this research, a workflow was developed to access building information augmented over the panoramic view of the real-world physical environment of the construction jobsite. A prototype was developed based on the created process and a user participation case study was conducted to test this system on a building renovation project. The results show that, an augmented panorama can provide a location-independent virtual reality experience, which is not significantly different from a pure-augmented-reality setting.;

Item Type: Article
Uncontrolled Keywords: human-computer interaction; user-centered evaluation; augmented panorama; panorama; building information modeling; case study; case studies; man machine interaction; construction industry
Index terms: panorama, virtual reality, construction industry, augmented panorama, building information modelling, case study, user-centred evaluation, building renovation, man machine interaction, workflow, virtual environment, prototype, user participation, construction personnel, construction site, human-computer interaction
Subjects: asset management, industry analysis, human-computer interaction, information systems, management, work location, visualization, modelling and simulation, participation process, data collection methods, workforce, user focus, virtual reality
Topics: Stakeholder Management, Engineering Principles, Research Practice, Business Strategy, Site Management, Human Resources, Digital Applications, Design Practice
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here