Analysis of contractors performance in Gaza Strip construction projects

Enshassi, A; Abdul-Aziz, A R and Abushaban, S (2012) Analysis of contractors performance in Gaza Strip construction projects. International Journal of Construction Management, 12(2), pp. 65-79. ISSN 1562-3599

Abstract

The construction industry has acquired a poor reputation in performance issues. Project success is dependent on, amongst other factors, the performance of the contractors. The aim of this paper is to identify and evaluate the main factors affecting the performance of construction projects in the Gaza strip. Sixty questionnaires were randomly distributed to contractors and 46 questionnaires were received (77% respondent rate). Sixty three factors were identified and categorized into ten groups. The level of importance of these factors were measured and ranked by their importance index from the contractors' perspectives. The most important factors were average delay arising from closures and materials shortage, availability of resources as planned through project duration, leadership skills of the project manager, escalation of material prices, availability of personnel with high experience and qualification and quality of equipments and raw materials in project. It is recommended that construction organizations have a clear mission and vision to formulate, implement and evaluate their performance.

Item Type: Article
Uncontrolled Keywords: contractor; performance; Gaza strip
Index terms: construction organization, project manager, project success, qualification, duration, construction industry, Gaza Strip, contractor's performance, personnel, construction project, questionnaire
Subjects: industry analysis, project controls, production management, project management theory and practice, contract management, physical geography and landforms, management, educational resources, profession, data collection methods, organization
Topics: Education, Time Control, Contract Administration, Human Resources, Roles and Professions, Business Strategy, Research Practice, Project Management, Geographical Context
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here