Evaluation of the modular method for industrial plant construction projects

Choi, J and Song, H (2014) Evaluation of the modular method for industrial plant construction projects. International Journal of Construction Management, 14(3), pp. 171-180. ISSN 1562-3599

Abstract

Industrial plant construction projects tend to become larger in their physical scale and complexity to incorporate the most advanced technologies from various industries. In order to respond to the rapidly changing industry demands, reducing construction durations has become the key factor to project success. Modular approach has been employed in this industry to mainly reduce construction durations. However, little research has been performed to evaluate the modular method in comparison to the conventional method, i.e., the stick-built method. The aim of this research is to help industry practitioners decide which method to be employed. In this study, the researchers evaluated the efficiency of modular method by performing a comparative analysis. The result of the estimated duration for the mechanical package installation showed that employing the modular method can reduce the construction duration by 2 months approximately. As a result of a validity assessment, the stick-built method scored lower than the modular method and so the modular method was valid to be employed.

Item Type: Article
Uncontrolled Keywords: construction duration; industrial plant construction; information technology; mechanical systems; modular construction
Index terms: comparative analysis, modular construction, construction project, practitioner, complexity, information technology, efficiency, package, project success, validity, duration, mechanical system
Subjects: project controls, building construction, systems engineering, performance management, production management, project management theory and practice, contractual arrangements, data analysis and analytics, evaluation and assessment methods, mechanical systems, computing systems, practitioner
Topics: Construction Technology, Procurement, Roles and Professions, Engineering Principles, Research Practice, Project Management, Time Control, Quality Management, Digital Applications
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here