Investigating the causes of delay in grain bin construction projects: The case of China

Chen, G X; Shan, M; Chan, A P C; Liu, X and Zhao, Y Q (2019) Investigating the causes of delay in grain bin construction projects: The case of China. International Journal of Construction Management, 19(1), pp. 1-14. ISSN 1562-3599

Abstract

Construction delay is a common issue in diverse types of projects and has attracted sustained attention from the industry and academia. However, it has seldom been addressed in grain bin projects which have a stricter requirement for on-time delivery to ensure prompt and appropriate grain storage. The aim of this study is to investigate the significant causes of delay in grain bin construction projects in China. To achieve this goal, a comprehensive literature review and 15 structured interviews were carried out, and a self-administered questionnaire was sent out to 108 respondents with experiences in constructing grain bin projects. Results showed that the top five delay causes for grain bin construction projects were 'shortage of adequate equipment,' 'poor communication among contracting parties,' 'problems with subcontractors,' 'inadequate experience of the design team' and 'frequent change orders by clients.' Also, results showed that the most significant delay cause category in grain bin construction projects was contractor-related causes. This study has provided the industry and academia with a deep understanding of the delay issue ingrain bin construction projects, which has also reinforced the knowledge body of delay research in the construction engineering and management domain.

Item Type: Article
Uncontrolled Keywords: cause of delay; factor analysis; grain bin projects; structural equation modelling
Index terms: factor analysis, causes of delay, academia, construction engineering, change order, contracting party, subcontractor, China, questionnaire, construction project, construction delay, literature review, design team, structural equation modelling, interview
Subjects: engineering methods, contractual condition, Geography, production management, project controls, educational institutions, statistical analysis, data collection methods, practitioner, data analysis and analytics, professional practice
Topics: Research Practice, Geographical Context, Project Management, Engineering Principles, Roles and Professions, Design Practice, Time Control, Contract Administration, Education
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here