Use of GIS to consider spatial aspects in construction planning process

Bansal, V K (2020) Use of GIS to consider spatial aspects in construction planning process. International Journal of Construction Management, 20(3), pp. 207-222. ISSN 1562-3599

Abstract

A construction planner mentally visualises two-dimensional (2D) drawings into a three-dimensional (3D) model and links its components with the respective activities to examine the developed network for missing activities, logical errors and space conflicts. This traditional planning practice does not consider locational and spatial aspects of a construction project which forms the basis in developing an executable construction plan and framing correct implementation strategies. Literature suggests the use of 3D visualisation, four-dimensional (4D) modelling, virtual reality (VR), construction simulation and building information modelling (BIM) to consider the spatial aspects of a project. However, these systems represent 3D virtual model of a building to be developed without considering consequences of surroundings on a construction plan. In this study, the impact of site topography and existing facilities in the surroundings on a construction plan has been considered using geographic information systems (GIS). The use of GIS in the construction planning process facilitates location-based analysis, modelling site constraints and spatial and non-spatial analyses on a single platform. The construction site in India has been modelled along with its site topography and all existing facilities, as the case study, to see their impact on the construction plan.

Item Type: Article
Uncontrolled Keywords: construction planning process; GIS in construction
Index terms: construction planner, construction project, 3D visualization, construction simulation, topography, framing, construction site, strategy, drawing, virtual reality, construction planning, India, geographic information system, modelling, implementation, platform, case study, building information modelling
Subjects: geographical techniques and analysis, information systems, physical geography and landforms, management, digital design, Geography, production management, technical documentation, visualization, modelling and simulation, work location, construction planning, analytical methods, contractual arrangements, conceptual models, virtual reality, data collection methods, practitioner
Topics: Engineering Principles, Research Practice, Geographical Context, Project Management, Business Strategy, Procurement, Roles and Professions, Digital Applications, Design Practice, Site Management
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here