Leagile strategies for optimizing the delivery of prefabricated house building projects

Mostafa, S; Tam, V W; Dumrak, J and Mohamed, S (2020) Leagile strategies for optimizing the delivery of prefabricated house building projects. International Journal of Construction Management, 20(8), pp. 867-881. ISSN 1562-3599

Abstract

Australian housing supply has not been responded at a rate commensurate with its growing demand. Residential housing sector is facing this serious shortage issue by actively developing and effectively using new construction material, processes and practices for sustaining its competitive advantage over other construction sectors in the Australian context. The Construction 2020 report confirmed prefabrication/off-site manufacturing (OSM) as a critical vision for the Australian construction industry’s future, as OSM provides opportunities for not only increased productivity and safety, but also decreased cost. It also has the capability of meeting the growing housing demand within the extant level of skilled labour. By combining lean and agile concepts, OSM’s supply responsiveness and efficiency can be intensified. The current research studies the association between demand–supply housing imbalance factors using mixed methods from literature and interviews. Literature has documented four main factors that drive this imbalance: (1) housing completion time; (2) cost of a finished house; (3) customer preferences and (4) level of skilled labour. Interviews with 13 industry professionals identified the four main leagile strategies used to deliver prefabricated building projects. Literature and interview findings supported the development and validation of multicriteria decision-making (MCDM) model comprising and incorporating these factors (and subfactors) and the four leagile strategies. The choice of the appropriate strategy to address the studied factors within the Australian context was optimized using analytic hierarchy process (AHP). The results from the AHP model show the suitability of applying each strategy at different degrees as influenced by the tested factors.

Item Type: Article
Uncontrolled Keywords: analytic hierarchy process; Australian housing; customer order decoupling point; leagile strategies; prefabrication/off-site manufacturing
Index terms: strategy, residential housing, decoupling, interview, off-site manufacturing, skilled labour, construction sector, suitability, housing, decision-making, validation, completion time, productivity, competitive advantage, efficiency, mixed method, customer preference, prefabricated building, prefabrication, construction industry, prefabricated house, construction material
Subjects: market analysis, project controls, decision analysis, building construction, design criteria, industry analysis, systems engineering, management, manufacturing engineering, performance management, construction integration, professional development, building materials, strategic management, construction type, data collection methods
Topics: Construction Technology, Risk Management, Engineering Principles, Information Management, Research Practice, Business Strategy, Time Control, Quality Management, Human Resources, Design Practice
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here