Investigative study of project procurement methods and project performance indicators in Saudi Arabia

Mosley, J C and Bubshait, A A (2021) Investigative study of project procurement methods and project performance indicators in Saudi Arabia. International Journal of Construction Management, 21(8), pp. 845-857. ISSN 1562-3599

Abstract

There exist two basic categories of a construction building procurement methods; those that combine project design with construction under one contract termed design-build (DB) and those that separate the design and construction functions into more than one contract or design-bid-build (DBB). This research compares the performance of DB and DBB in the context of the Saudi Arabian construction industry as an example of international construction practices, by statistically quantifying the effects that project procurement methods had on three objective and 10 subjective performance indicators. The notion that DB outperforms DBB is supported by this research.

Item Type: Article
Uncontrolled Keywords: design-bid-build; design-build; project performance indicators; project procurement method
Index terms: project procurement, performance indicator, building procurement, design and construction, international construction, project performance, construction industry, Saudi Arabia, project design, design-bid-build
Subjects: Geography, project management theory and practice, performance management, industry analysis, strategic management, contractual arrangements
Topics: International Construction, Quality Management, Procurement, Research Practice, Geographical Context, Project Management
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here