An overview of the risk of delay in Cyprus construction industry

Vacanas, Y and Danezis, C (2021) An overview of the risk of delay in Cyprus construction industry. International Journal of Construction Management, 21(4), pp. 369-381. ISSN 1562-3599

Abstract

This article determines the main issues related to delay in construction projects in Cyprus. Initially, a detailed comparative review was carried out to identify the most significant causes of delay at the international level. Based on the latter and the opinions of distinguished members of the industry, a survey questionnaire was designed and distributed to a total number of 242 members of the Cyprus Scientific and Technical Chamber. The analysis of the results obtained by 54 respondents indicated particular common-practice issues that affect completion in construction projects in Cyprus, such as duration of delays, Extension of time (EOT) awards and agreements, recording methods and programmes of works. Ultimately, by using the importance of delay causes as perceived by the respondents it was determined that in Cyprus construction industry 'variations requested by the client' (70%), 'mistakes and missing information from consultants' drawings' (55%), 'low productivity' (55%), 'difficulties in financing of the works by the contractor' (52%) and 'inadequate programming of works' (50%) to be the main causes of delay in Cyprus. Based on the results, specific practices are recommended for the control of delay in the completion of construction projects.

Item Type: Article
Uncontrolled Keywords: causes; Cyprus; delay; project management
Index terms: programme, survey, drawing, financing, questionnaire, programming, construction project, variation, productivity, agreements, project management, Cyprus, construction industry, duration, causes of delay
Subjects: management, production management, Geography, contractual condition, project management theory and practice, project controls, industry analysis, data collection methods, programming, contract formation, technical documentation, economic analysis
Topics: Contract Administration, Time Control, Digital Applications, Design Practice, Research Practice, Geographical Context, Project Management, Business Strategy
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here