Integrated lean concepts and continuous/discrete-event simulation to examine productivity improvement in door assembly-line for residential buildings

Afifi, M; Fotouh, A; Al-Hussein, M and Abourizk, S (2022) Integrated lean concepts and continuous/discrete-event simulation to examine productivity improvement in door assembly-line for residential buildings. International Journal of Construction Management, 22(13), pp. 2423-2434. ISSN 1562-3599

Abstract

Efforts within the construction-manufacturing domain to improve assembly-line operations have benefited from paradigms emerging in the late-1990s such as lean manufacturing. This study investigates lean concept solutions to enhance productivity prior to capital investments. The investigation is carried on a case study of a single-door assembly line for residential buildings. Lean improvements are examined through an integrated continuous/discrete-event simulation approach, aiming to increase the productivity of the assembly line. The proposed simulation model incorporates factors representing the system reliability. Continuous simulation modelling, using state variable technique, is implemented to facilitate the observation of door unites in targeted sections to track the accumulation levels in these particular sections of the assembly line. In addition, proposed solutions for productivity improvements are implemented within the simulation model, such as introducing advanced alternatives for the automated stations and adding parallel stations. The effect on the productivity of the assembly line was successfully evaluated after the implantation of the proposed improvements in the simulation model. Relevant approaches can be implemented to evaluate and improve modular construction assembly lines prior to incurring capital investment.

Item Type: Article
Uncontrolled Keywords: assembly line; lean; simulation
Index terms: case study, modular construction, simulation modelling, investigation, residential building, paradigm, lean manufacturing, assembly line, capital investment, productivity
Subjects: education and knowledge transfer, analytical methods, management, economic analysis, building construction, data collection methods, manufacturing engineering, construction type
Topics: Research Practice, Business Strategy, Construction Technology, Engineering Principles
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here