Framework for selection of lean construction tools based on lean objectives and functionalities

Aslam, M; Gao, Z and Smith, G (2022) Framework for selection of lean construction tools based on lean objectives and functionalities. International Journal of Construction Management, 22(8), pp. 1559-1570. ISSN 1562-3599

Abstract

Lean construction (LC) has been used as the potential project management philosophy to overcome some productivity and waste issues and addressing challenges of the construction industry. Furthermore, to facilitate LC implementation, different lean tools have been developed for LC. Presently, the initial selection of lean tools is predominantly objective-based with little consideration to its conformity with the construction methodology. This research aims at bringing clarity within the mindset of constructors in selecting the most appropriate tool during the initial selection phase. An extensive literature review is carried out in identifying the objectives and functionalities of each LC tool. The results indicate that many tools have almost similar objectives but different functionalities thereby making the selection criteria sensitive to the functionalities of the lean tools. The functionalities of lean tools have to be consistent with the respective construction processes for the successful implementation of LC. Finally, a framework has been proposed for selecting the most appropriate lean tools. The major contribution of this study is to improve the decision making capability of the constructors in selecting the most appropriate tool that works in consistence with the construction.

Item Type: Article
Uncontrolled Keywords: application methodologies; functionalities; lean construction tools; objectives; similarities
Index terms: productivity, implementation, selection criteria, construction industry, project management, lean construction, mindset, functionality, literature review, philosophy, construction process, decision-making, methodology
Subjects: tendering, research methods, management, project management theory and practice, decision analysis, building construction, industry analysis, philosophical studies, health behaviours and lifestyles, design features, data analysis and analytics, contractual arrangements
Topics: Procurement, Risk Management, Research Practice, Project Management, Business Strategy, Site Management, Design Practice
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here