Prediction of simulated cost contingency for steel reinforcement in building projects: ANN versus regression-based models

El-Kholy, A M; Tahwia, A M and Elsayed, M M (2022) Prediction of simulated cost contingency for steel reinforcement in building projects: ANN versus regression-based models. International Journal of Construction Management, 22(9), pp. 1675-1689. ISSN 1562-3599

Abstract

If cost contingency is too high, it might cause the construction project to be uneconomic, aborted, and lock-up funds not available for other organizational activities; if too low, it may result in unsatisfactory performance outcomes. To predict the simulated cost contingency (SCC), a Monte Carlo Simulation (MCS) is applied. However, the use of simulation in most cases is difficult, cumbersome and rarely used in the construction industry. The objective of the current research is to develop ANN and regression based (RB) models to predict the SCC for building projects due to the variability of steel reinforcement (SR) prices. For all the adopted scenarios in dealing with the independent variables, the results revealed that on the average, ANN models are more powerful than RB models in theoretical modeling of SCC when comparing its predicted value with its actual simulated value. On the contrary, RB models outperform ANN models from practical point of view when comparing predicted SCC with its real value. Thus, contractors are advised to adopt RB models in predicting SCC for the practicality in estimating cost contingency. However, the developed models are expected to be highly beneficial for contractors in making SCC calculations easier.

Item Type: Article
Uncontrolled Keywords: artificial neural networks; Monte Carlo simulation; regression based models; simulated cost contingency; steel reinforcement prices
Index terms: artificial neural network, estimating, construction project, Monte Carlo simulation, independent variable, performance outcome, modelling, construction industry, variability, reinforcement
Subjects: industry analysis, statistical analysis, production management, analytical methods, financial and cost management, modelling and simulation, building materials, value management
Topics: Engineering Principles, Construction Materials, Research Practice, Project Management, Cost Management
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here