Critical risk factors for implementing building information modelling (BIM): A Delphi-based survey

Khoshfetrat, R; Sarvari, H; Chan, D W M and Rakhshanifar, M (2022) Critical risk factors for implementing building information modelling (BIM): A Delphi-based survey. International Journal of Construction Management, 22(12), pp. 2375-2384. ISSN 1562-3599

Abstract

Building information modelling (BIM) is one of the new technologies that, despite its perceived benefits and positive impacts towards the project objectives, has a very low level of adoption. The main problem with this issue may be attributed to several potential risk factors that disrupt the implementation of this technology. Previous research studies have identified various significant risk factors for implementing BIM technology, however, the relationships between these risk factors have not been evaluated and analyzed. This paper aims to identify and evaluate the critical risk factors (CRFs) for BIM adoption via several rounds of Delphi surveys. A total of 52 potential risk factors were identified and classified by an extensive desktop literature review. The analysis of Delphi questionnaires, which were distributed and responded by a panel of BIM experts in three rounds, identified 36 major factors as CRFs of BIM. Then the relationships between these 36 CRFs were determined and assessed by using the decision-making trial and evaluation laboratory method (DEMATEL). The results showed that the CRFs such as: lack of knowledge of BIM and need for software training, resistance to change, and lack of skilled BIM architects/engineers have the most profound impact and interaction with other risk factors. The identification and prioritization of the CRFs can enable BIM users to conduct a systematic risk management and analysis and develop appropriate effective strategies for mitigating the potential risks associated with BIM implementation in a proactive manner.

Item Type: Article
Uncontrolled Keywords: building information modeling; critical risk factors; implementation; risk evaluation; risk identification
Index terms: survey, risk identification, strategy, literature review, laboratory, questionnaire, decision-making, engineer, low level, Delphi survey, new technology, building information modelling, interaction, implementation, architect, risk factor, risk management
Subjects: information systems, environmental hazards, behavioral psychology, measurement and scaling, decision analysis, research management, financial risk, management, innovation and technology management, contractual arrangements, data analysis and analytics, data collection methods, risk assessment, profession
Topics: Risk Management, Roles and Professions, Sustainability, Procurement, Business Strategy, Cost Management, Engineering Principles, Research Practice, Digital Applications
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here