Evaluation of 4D BIM tools applicability in construction planning efficiency

Martins, S S; Evangelista, A C J; Hammad, A W A; Tam, V W Y and Haddad, A (2022) Evaluation of 4D BIM tools applicability in construction planning efficiency. International Journal of Construction Management, 22(15), pp. 2987-3000. ISSN 1562-3599

Abstract

Worldwide the construction industry presents a significant demand for new technologies ensuring certainty, cost-effectiveness and time efficiency. Modern construction relies on digital resources, and one of the most prominent novelties is Building Information Modelling (BIM). Construction planning effectiveness is based on clear communication and integration between project planners and other participants, such as engineers, architects, suppliers, and workforce. The possible connection between 3D models and time or scheduling potentially reduces misconception risks and lack of information to avoid re-scheduling and project delivery delays. This study aims to investigate the integration of Revit, Navisworks, Tally and Green Building Studio for identifying the challenges in applying 4D BIM technology using a case study in a developing country (Brazil). The research method used comprised these steps: objectives definition, literature review, development of the 4D analysis and evaluation, case study for validation with comparison to other comparable and contrasting studies, and discussion of the results. This paper demonstrates the feasibility and challenges to adopt BIM technology to thrive better communication for teams and stakeholders through the various construction stages via visual representation. Additionally, despite the obstacles and difficulties to integrate different software, it is beneficial to the decision-makers, not only focus on the constructability perspective but project’s environmental impacts, such as energy efficiency and global warming effect.

Item Type: Article
Uncontrolled Keywords: 4D; building information modelling; cost; planning; simulation; sustainability
Index terms: validation, environmental impact, green building, studio, integration, time efficiency, scheduling, developing country, cost-effectivenes, global warming, Brazil, literature review, planner, effectiveness, architect, construction stages, construction planning, project delivery, constructability, construction industry, new technology, case study, building information modelling, energy efficiency, efficiency, engineer, 3D model
Subjects: professional development, development economics, Geography, construction integration, performance management, economics, design practice, management, information systems, industry analysis, organizational analysis, climate science, environmental impact, computational design, data collection methods, profession, construction type, project delivery, construction planning, innovation and technology management, data analysis and analytics, operations research, sustainability and energy
Topics: Site Management, Organizational Design, Time Control, Digital Applications, Design Practice, International Construction, Quality Management, Roles and Professions, Sustainability, Procurement, Construction Technology, Cost Management, Business Strategy, Information Management, Engineering Principles, Project Management, Geographical Context, Research Practice
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here