Development of an integrated ground modelling system

McMahon, P; Dawood, N N and Hobbs, B (1999) Development of an integrated ground modelling system. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Abstract

Ground conditions play a major role in any civil engineering or building project, they influence the design of all aspects of the site. Large costs can be attributed to this type of work, often referred to as earthworks. Effective IT support for the design decision-making process has the potential to generate significant cost savings. This paper aims to overview some of the findings of the specification, software survey, software solution and the development work required to develop such a system.). The background work, data collection processes and analysis techniques used in the development of the specification and software survey are described briefly. The chosen software (base software) and the specification are summarized. The specification is split into two parts: the core system and the extended systems. The core system is the focus of the research as it will satisfy the requirements of the construction team as a whole. The extended systems will integrate with the core system and will serve the needs of the specialists. The areas in which the commercial software solution fails to meet the specification requirements are standardization, design links and detailed costing. The solution to these developments is currently being addressed in the form of a theoretical prototype.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: cost; earthwork; integration; link; standardization
Index terms: earthwork, prototype, modelling, ground condition, survey, specification, design decision, costing, construction team, cost saving, integration, standardization
Subjects: analytical methods, project delivery, modelling and simulation, economics, design practice, data collection methods, construction methods, contractual condition, geotechnical engineering, accounting and finance, performance measurement, organizational analysis
Topics: Engineering Principles, Research Practice, Design Practice, Cost Management, Organizational Design, Quality Management, Project Management, Contract Administration
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here