Using moving-window cross-validation algorithm to optimize bid-based cost estimating data usage

Pakalapati, K; Khalafalla, M and Rueda-Benavides, J (2022) Using moving-window cross-validation algorithm to optimize bid-based cost estimating data usage. International Journal of Construction Management, 22(15), pp. 2855-2863. ISSN 1562-3599

Abstract

Transportation agencies provide guidance on using bid data from previous projects to prepare construction cost estimates that are based on assumptions whose validity is not challenged in the existing literature. Some of these assumptions refer to the optimal number of years of past data that should be used in bid-based estimating. This study aims to develop an approach that assists with the definition of optimal look-back periods for data retrieval to maximize cost estimating effectiveness in transportation construction projects. Identifying the optimal amount of data is irrelevant if it is not properly collected and processed. The proposed look-back period determination process is presented as part of a broader cost estimating system intended to ensure the effective use of the retrieved data. The paper presents an assessment of 20 cost indexing alternatives to identify the one that facilitates the highest estimating accuracy. The methodology consists of an innovative moving-window cross-validation algorithm designed to measure the performance of the estimating system for different look-back periods ranging from one to five years.

Item Type: Article
Uncontrolled Keywords: cost estimating; look-back period and cost index; moving window
Index terms: validation, methodology, construction project, window, estimating, cost estimating, accuracy, data retrieval, effectiveness, estimate, indexing, validity, cost index, transportation agency, construction cost
Subjects: evaluation and assessment methods, economic analysis, financial and cost management, production management, professional development, architectural elements, performance management, research methods, transportation engineering, information systems, data management
Topics: Cost Management, Business Strategy, Information Management, Engineering Principles, Research Practice, Project Management, Digital Applications, Design Practice, Quality Management
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here