Impediments affecting a comprehensive emission assessment at the construction stage of a building

Sandanayake, M; Zhang, G and Setunge, S (2022) Impediments affecting a comprehensive emission assessment at the construction stage of a building. International Journal of Construction Management, 22(3), pp. 453-463. ISSN 1562-3599

Abstract

Emissions at the construction stage of a building have been overlooked due to several impediments and complications. Identification and categorization of these complications could be the initial step towards carrying out a systematic assessment of construction stage emissions. This study aims to investigate major impediments affecting an emission study in building construction. Triangulation approach was adopted to collect the required data for the study in the form of literature review study, interviews and questionnaire survey distribution. Eighteen factors were identified through literature reviews and interviews with professionals in the construction industry and further investigated through a questionnaire survey. Ranking analysis was used to identify 11 critical factors out of which 'difficulties in collection of construction site specific data', 'commercial sensitivity of the data' and 'lack of data inventories and standards to estimate emissions' were identified as the most important factors. Using factor analysis, the identified factors were grouped into three categories, namely data related issues, scope definition issues and cost and technology related issues. Findings and the future research directions from the study provide valuable reference to researchers and industry practitioners who seek to pursue a comprehensive emission study at the construction stage of a building.

Item Type: Article
Uncontrolled Keywords: buildings; construction stage; environmental emissions; impediments
Index terms: factor analysis, estimate, construction industry, inventory, critical factor, questionnaire, practitioner, triangulation, interview, survey, construction site, literature review, building construction
Subjects: inventory management, building construction, industry analysis, statistical analysis, risk assessment, data collection methods, research design and methodology, practitioner, work location, data analysis and analytics, financial and cost management
Topics: Supply Chain Management, Site Management, Research Practice, Cost Management, Construction Technology, Roles and Professions, Risk Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here