The severity of design-construction interface risks in Jordanian construction industry

Abu-Reishah, L and Hiyassat, M A (2023) The severity of design-construction interface risks in Jordanian construction industry. International Journal of Construction Management, 23(9), pp. 1540-1548. ISSN 1562-3599

Abstract

The fragmented nature of the construction industry makes the management of a project a challenge mission. The interfaces between activities require attention to ensure a smooth performance. Interface risks affecting project constraints arise due to many internal and external causes. The main objective of this study is to identity, prioritize, eliminate, and alleviate interface risks. The data was collected from 155 respondents to a questionnaire; which was checked for reliability and validity using Cronbach alpha coefficient and EFA, respectively. ANOVA test was used to show if significant differences exist between the groups of respondents. According to the results of the risks-assessment matrix, the most two severe causes of interface risks are: awarding the contract to the lowest bidder regardless of the quality, and change in the owner's requirements. The study recommends that construction parties should develop a comprehensive strategy in establishing a sustainable interface-risks management. This study serves as another tool that can help construction professionals and researchers in dealing with similar interface risks. Also—beside findings from other studies—construction agencies such as FIDIC can modify their conditions accordingly when dealing with such risks.

Item Type: Article
Uncontrolled Keywords: construction project; interface risk; risk matrix
Index terms: bidder, construction professional, identity, construction industry, FIDIC, owner, validity, construction project, questionnaire, agency, strategy, project constraint
Subjects: production management, professional development, management, industry analysis, sociology, control systems, evaluation and assessment methods, data collection methods, standard forms of contract, bidding
Topics: Business Strategy, Information Management, Research Practice, Project Management, Stakeholder Management, Procurement
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here