Safety communications management in construction contracting

Preece, C and Stocking, S (1999) Safety communications management in construction contracting. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Abstract

This paper outlines the adaptation of communication theory and the development of safety communications management in construction contracting. Effective and efficient safety communication is essential in raising safety awareness and reducing incident frequency in the construction industry, and has the resultant effect of decreasing costs and increasing contractor profitability. Management should work hard at analysing organizational safety communication and removing barriers to effective and efficient safety communication by applying improvement techniques. To ensure continual improvement of safety communication an integrated total safety communications management system is proposed based on proven Total Quality Management and behaviour-based safety principles. Implementation of this requires complete, visible and long-term top management commitment to succeed.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: communication; construction; contracting; safety
Index terms: commitment, adaptation, total quality management, management system, implementation, construction industry, communication theory, top management, profitability
Subjects: contractual arrangements, evaluation methods, economic analysis, psychology, user focus, industry analysis, communication studies, management
Topics: Business Strategy, Information Management, Research Practice, Procurement, Design Practice, Quality Management, Organizational Design
Descriptive scope: 2 CT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here