Dang-Trinh, N; Duc-Thang, P; Nguyen-Ngoc Cuong, T and Duc-Hoc, T (2023) Machine learning models for estimating preliminary factory construction cost: Case study in southern Vietnam. International Journal of Construction Management, 23(16), pp. 2879-2887. ISSN 1562-3599
Abstract
Construction of industrial enterprises has become more necessary in recent years. It is critical for project managers to estimate the entire cost of a building project at this early stage. Existing approaches that use operator experience as a mathematical formula. Initial estimates are inaccurate due to the lack of available data points, which leads to overruns in project costs. This research utilizes different machine learning techniques to predict preliminary factory construction cost. Five popular numeric predictive techniques: support vector machine (SVM), artificial neural network (ANN), generalized linear regression (GENLIN), classification and regression-based techniques (CART), exhaustive chi-squared automatic interaction detection (CHAID) are used for baseline and ensemble models. A deep learning neural network (DLNN) is also utilized in this study. The machine learning model is trained and tested on actual data gathered in the southern part of Vietnam. Deep learning outperforms all other machine learning algorithms in this comparison, while the ensemble model of artificial neural networks and generalised linear regression also fared well. Cost estimators can quickly pick the best model for projecting the cost of constructing a preliminary factory by having access to a variety of estimate methodologies.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | deep learning; ensemble model; industrial construction; machine learning; preliminary cost |
| Index terms: | neural network, project cost, overrun, artificial neural network, Vietnam, machine learning, estimating, methodology, construction cost, deep learning, project manager, case study, interaction, estimate, industrial construction, cost estimator |
| Subjects: | behavioral psychology, project controls, building construction, Geography, economics, research methods, artificial intelligence, financial and cost management, modelling and simulation, profession, data collection methods |
| Topics: | Roles and Professions, Cost Management, Engineering Principles, Geographical Context, Research Practice, Time Control, Digital Applications |
| Descriptive scope: | 4 PCTE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here