The compounding effect of multiple disruptions on construction projects

Lishner, I and Shtub, A (2023) The compounding effect of multiple disruptions on construction projects. International Journal of Construction Management, 23(6), pp. 1061-1068. ISSN 1562-3599

Abstract

A construction project life cycle model that simulates the effect of disruptions on labor productivity is in the center of this research. The model (which is based on a model developed at the MIT), is used in order to find the parameters which contribute to the stability and robustness of labor productivity under disruptions. The study included analysis of randomly generated 1,363 different projects and 68,150 simulated scenarios to measure the effect of disruptions in projects on the labor productivity It demonstrates the ripple effect, an exponential increase in project duration caused by a high volume of disruptions, and points out the factors and parameters that influence it. The four hypotheses in this study were tested using a statistical hypothesis testing procedure. The novelty of this paper is by finding the parameters that control the ripple effect, we were able to analyze the effect of the multiple disruptions on the project duration and identify the project properties that have the most significant influence. The findings of this study can help managers to reduce the project’s risks and increase its stability.

Item Type: Article
Uncontrolled Keywords: labor productivity; management; modeling; project; ripple effect; simulation; system dynamics
Index terms: life cycle, duration, testing, modelling, labour productivity, stability, manager, system dynamics, construction project
Subjects: production management, management, structural engineering, project controls, practitioner, computing systems, value management, professional practice, analytical methods
Topics: Digital Applications, Site Management, Time Control, Engineering Principles, Project Management, Roles and Professions
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here