A novel multiple objective whale optimization for time-cost-quality tradeoff in non-unit repetitive projects

Nguyen, D T; Doan, D T V; Tran, N N C and Tran, D H (2023) A novel multiple objective whale optimization for time-cost-quality tradeoff in non-unit repetitive projects. International Journal of Construction Management, 23(5), pp. 843-854. ISSN 1562-3599

Abstract

Project managers are the ones who struggle to complete the project with the shortest possible time, the least amount of costs and, the highest quality. The primary objective in the planning stage of the project management process is to identify the most suitable schedule from provided time–cost-quality curve. Scheduling of construction repetitive projects assumes the same production and hard logic between units. This study proposes a free-parameter multiple objective whale optimization (MOWO) to tradeoff the time, cost and, quality factors in non-unit repetitive projects (NRP). An external scheduling system shall consider project activities dependencies, multiple crew assignments, and soft logic in units to calculate project duration, cost and, quality. A construction case study was used to examine MOWO performance. Furthermore, some broadly recognized multiple objective evolutionary algorithms are employed to compare with the proposed algorithm. Result comparison points out that MOWO attained the best optimization outcomes in handling the time-cost-quality tradeoff in non-unit repetitive construction projects.Highlights This study presents an advanced multiple optimization algorithm MOWO. A scheduling subsystem is proposed to enable TCQ tradeoff in non-unit repetitive projects. MOWO is applied to solve TCQ for non-unit repetitive construction projects. The model performance is demonstrated in the experimental results.

Item Type: Article
Uncontrolled Keywords: multiple objective; repetitive project; time-cost-quality tradeoffs; whale optimization
Index terms: duration, repetitive construction, scheduling, project manager, repetitive project, tradeoff, case study, project management process, optimization algorithm, evolutionary algorithm
Subjects: operations research, project controls, decision analysis, production management, data collection methods, building construction, algorithms, project management theory and practice, profession
Topics: Research Practice, Construction Technology, Roles and Professions, Risk Management, Time Control, Digital Applications, Project Management
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here