Interdisciplinary interaction during concept design

Steele, J; Austin, S A; Macmillan, S; Kirby, P and Spence, R (1999) Interdisciplinary interaction during concept design. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Abstract

Decisions taken during the conceptual design phase of a project have fundamental and extensive effects on both cost and performance. There are growing demands on interdisciplinary design teams to generate better and more innovative solutions to problems of increasing complexity. To meet these demands, more efficient and effective design methods and processes are required. At present, there are no construction industry guidelines to assist focused interdisciplinary team interaction during the conceptual phase of design. This paper will describe current research work to study the conceptual design activity of interdisciplinary teams. It will describe two recent design workshops that were held to allow real-time design activity to be monitored and mapped, and a preliminary conceptual design framework to be tested. The findings of the workshop highlight the iterative nature of conceptual design activity and provide much needed insights into the ways in which interdisciplinary teams progress during the early phases of design.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: conceptual phase; design process; interdisciplinary; teamwork
Index terms: conceptual design, design method, construction industry, interaction, complexity, design workshop, workshop, design process, teamwork, design team, concept design
Subjects: behavioral psychology, systems engineering, industry analysis, design process, design practice, management, professional practice, design methods, construction type
Topics: Research Practice, Engineering Principles, Construction Technology, Design Practice, Organizational Design
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here