A critical analysis of benefits and challenges of implementing modular integrated construction

Tsz Wai, C; Wai Yi, P; Ibrahim Olanrewaju, O; Abdelmageed, S; Hussein, M; Tariq, S and Zayed, T (2023) A critical analysis of benefits and challenges of implementing modular integrated construction. International Journal of Construction Management, 23(4), pp. 656-668. ISSN 1562-3599

Abstract

Modular integrated construction (MiC) has recently been promoted by the advanced countries as an effective solution to 1) enable fast construction, 2) enhance the diminishing construction productivity, and 3) support sustainable development. In response to the COVID-19 pandemic, the completion of a MiC-based 1000-bed hospital in Wuhan, China, in less than a month, has made the world, especially sophisticated economies, 'talking' about this new technology. However, MiC is an ultra-modern technology that has both its merits and demerits; balancing out between them to maximize the opportunities that MiC has to offer needs insightful decision-making from higher authorities. Therefore, there is a vital need to understand and analyze the two contrasting but related matters, 'benefits and challenges of MiC' to help decision-makers in formulating better strategies based on informed choices. Past studies on MiC reported benefits in terms of time, cost, quality, safety, and environmental and social impacts, however, lack a holistic synthesis of MiC benefits by considering data from both the literature and real case studies. Whereas, the assessment methodologies used to prioritize MiC challenges did not consider the hierarchical nature of these challenges and their relative importance, which in turn impact the prioritization accuracy. This study contributed to bridging these gaps. Firstly, MiC benefits have been extensively explored by adopting a mixed research approach integrating literature synthesis, structured discussions, and real case studies. Then, a list of challenges was explored through literature synthesis and further validated and shortlisted through the first set of interviews from MiC experts. The second set of interviews was aimed mainly at evaluating the performance of MiC and providing recommendations for improvement from the international perspective. The interviews revealed that MiC should be treated as a long-term strategy and would not necessarily be a cheaper option in the short run, however, it would be a revolution in terms of time, quality, sustainability, safety, and life-cycle costs. Following the interviews, a questionnaire survey was conducted to prioritize the challenges using the multi-attribute group decision-making (MAGDM) approach, namely, Analytical Hierarchy Process (AHP), considering the hierarchical nature of challenges and their relative importance. The 'road network capacity' was found to be the most critical challenge. Finally, case studies were further carried out to reveal the measures that were adopted to mitigate the challenges in three international MiC projects. This research provides an interesting insight into the positive and negative aspects of using MiC for interested governments and construction stakeholders. It is anticipated that the benefits shall outweigh the drawbacks in the long run.

Item Type: Article
Uncontrolled Keywords: analytical hierarchical process; benefits; case studies; challenges; modular integrated construction; sustainability
Index terms: option, social impact, construction productivity, analytical hierarchy process, case study, new technology, pandemic, China, questionnaire, decision-making, methodology, accuracy, survey, sustainable development, strategy, COVID-19, interview, relative importance
Subjects: decision analysis, sociology, decision-making and optimization, research methods, management, health risk and incident analysis, professional development, Geography, health safety and environment, operations management, innovation and technology management, data collection methods, risk assessment
Topics: Risk Management, Project Management, Geographical Context, Research Practice, Information Management, Engineering Principles, Business Strategy, Health and Safety
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here