Gharaie, E; Wakefield, R and Blismas, N (2010) Explaining the increase in the Australian average house completion time: Activity-based versus workflow-based approach. Construction Economics and Building, 10(4), pp. 34-49. ISSN 2204-9029
Abstract
The Australian house building industry has been facing an increase in the average house completion time in the last decade. This increase in some states is quite dramatic. For instance, Western Australia has faced a 70 percent increase in the average house completion time during this period. This paper uses two planning approaches to explain this; i) the activity-based planning methods and ii) the workflow-based planning methods. In addition, this research investigates the strengths and weaknesses of these two planning approaches in explaining the behaviour of the house building industry. For this purpose, a national case study and five state case studies including Victoria, Western Australia, New South Wales, Queensland and South Australia have been used. The data related to the key parameters have been collected and their correlation with the average house completion time has been investigated. These key parameters include the average house floor area, the number of house completions and the number of houses under construction. The reasons for the increasing trend of the average house completion time have been postulated in all case studies. According to this research, the increase in the average house completion time cannot be explained using activity-based planning methods. In contrast, by using workflow-based planning methods, it has been shown that the average house completion time is correlated with the number of houses under construction. This paper shows that the average completion time is influenced directly by the workflow in the house building industry and that workflow planning should be the basis for the house building industry planning.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | Australian house building industry; activity; average house completion time; based planning; flow; work |
| Index terms: | Queensland, Australia, South Australia, workflow, Victoria, New South Wales, completion time, planning method, case study, building industry |
| Subjects: | industry analysis, regions and continents, urban planning, project controls, Geography, physical geography and landforms, data collection methods, management |
| Topics: | Time Control, Governance, Geographical Context, Research Practice, Business Strategy |
| Descriptive scope: | 3 PCE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here