Determining the effective factors leading to incidence of human error accidents in industrial parks construction projects: Results of a fuzzy Delphi survey

Rafieyan, A; Sarvari, H; Beer, M and Chan, D W M (2024) Determining the effective factors leading to incidence of human error accidents in industrial parks construction projects: Results of a fuzzy Delphi survey. International Journal of Construction Management, 24(7), pp. 748-760. ISSN 1562-3599

Abstract

The implementation of construction projects is always associated with several incidents for various reasons. Previous research studies advocated that human errors are one of the main causes of accidents in these projects. This paper aims to determine the effective factors leading to the occurrence of accidents caused by human errors in Industrial Parks Construction Projects (IPCPs) based in Iran. For this purpose, four rounds of the fuzzy Delphi survey were conducted with the presence of fifteen experienced experts engaged in the HSEE (health, safety, environment and energy) department of Industrial Parks in Iran. The reliability and validity of the questionnaire were reviewed and confirmed. Based on the results of the Delphi survey, forty-one factors contributing to human errors in the implementation of IPCPs were determined and classified into nine main groups. The survey findings manifested that the identified effective factors have a strong effect on the occurrence of construction accidents caused by human errors. The results of this research study have provided various major project stakeholders and safety managers with a useful decision-aid tool to make more pragmatic decisions in managing, reducing and avoiding the occurrence of construction site accidents particularly caused by human errors associated with IPCPs.

Item Type: Article
Uncontrolled Keywords: construction projects; fuzzy Delphi technique; human errors; industrial parks; Iran; site safety
Index terms: manager, survey, construction project, questionnaire, construction site accident, construction accident, Delphi survey, major project, validity, presence, implementation, fuzzy Delphi
Subjects: production management, health risk and incident analysis, decision-making and optimization, occupational health and safety management, practitioner, data collection methods, evaluation and assessment methods, contractual arrangements, environmental science, strategic project management
Topics: Roles and Professions, Sustainability, Procurement, Health and Safety, Research Practice, Project Management
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here