Tatum, M C and Terrell, F (2012) Hurricane reconstruction in the United States Gulf Coast. International Journal of Disaster Resilience in the Built Environment, 3(3), pp. 199-219. ISSN 1759-5916
Abstract
The purpose of this paper is to study construction companies performing reconstruction to better understand the positive and negative effects of hurricanes on the construction industry. Construction companies with hurricane reconstruction experience in gulf coast states were surveyed to obtain information about their activities from 1999 to 2008. A wide range of company sizes were represented in the collected data, from less than 15 to more than 100 employees, and from less than five to more than 100 million dollars in annual work volume. Specific points investigated include how hurricane reconstruction affects profitability, scheduling, estimating accuracy, and volume of business (both short term and subsequent). Other factors examined were labour availability, labour costs, material prices, material availability and how insurance company involvement impacted work progress. While the rewards of additional work are obvious, this study found that labour shortages, availability of materials, and issues with insurance companies are the main risks construction companies face. Construction companies should have a hurricane construction plan to capitalize fully on so much opportunity. The plan should include contingency pricing to combat the rise in job costs, a geographic region to work into keep from getting over extended, a strong labour force, and a plan for displaced employees. A plan will help mitigate risk and increase the probability of success. This paper should provide useful information for contractors, government entities and others who are involved with reconstruction efforts after unpredictable disasters, particularly hurricanes.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | disaster cost; hurricane construction; hurricane reconstruction; hurricanes; natural disasters; post disaster reconstruction; United States of America |
| Index terms: | estimating, face, construction company, accuracy, natural disaster, United States, disaster cost, labour force, scheduling, construction industry, labour cost, insurance, post-disaster reconstruction, labour shortage, profitability, reconstruction, United States of America, pricing |
| Subjects: | economics, post-disaster and reconstruction, Geography, professional development, building construction, industry analysis, environmental hazards, cost management, organization, psychology, operations research, financial and cost management, economic analysis |
| Topics: | Business Strategy, Cost Management, Information Management, Engineering Principles, Geographical Context, Research Practice, Sustainability, Procurement, Urban Studies, Supply Chain Management, Organizational Design, Time Control |
| Descriptive scope: | 3 PCT |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here