Jones, K; Desai, A; Brosnan, N; Cooper, J and Ali, F (2017) Built asset management climate change adaptation model. International Journal of Disaster Resilience in the Built Environment, 8(3), pp. 263-274. ISSN 1759-5916
Abstract
Purpose: The purpose of this paper is to present results of an action research addressing climate change adaptation of selected social housing stock in the UK. Climate change continues to pose major challenges to those responsible for the management of built assets. The adaptation required to address long-term building performance affected by climate change rarely get prioritised above more immediate, short-term needs (general built asset management needs). Design/methodology/approach: The study adopts an in-depth participatory action research with a London-based social landlord and integrates climate change adaptation framework and performance-based model established through author’s previous research projects. Findings: A staged process for including adaptation measures in built asset management strategy is developed along with metrics to analyse the performance of the housing stock against climate change impact of flooding. The prioritisation of adaptation measure implementation into long-term built asset management plans was examined through cost-based appraisal. Research limitations/implications: The research was carried out with a singular organisation, already acquainted with potential climate change impact, vulnerability and adaptive capacity assessment. The process adopted will differ for similar organisation in the sector with different settings and limited working knowledge of climate change impact assessment. Practical implications: The paper concludes with a ten-step process developed as an aide memoir to guide social landlords through the climate change adaptation planning process. Originality/value: In addition to the practical results from the study, the paper outlines a novel process that integrates resilience concepts, risk framing (to climate change impact) and performance management into built asset management (maintenance and refurbishment) planning.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | adaptation; built asset management; built environment; climate change; housing; resilience |
| Index terms: | implementation, social housing, London, built environment, adaptive capacity, adaptation, planning process, performance management, landlord, built asset management, built asset, appraisal, housing, climate change, performance-based, methodology, vulnerability, impact assessment, strategy, flooding, building performance, housing stock, framing, action research |
| Subjects: | contractual arrangements, conceptual models, user focus, construction type, data collection methods, value management, climate science, asset management, sociology, project controls, housing and residential development, environmental hazards, quality assurance, infrastructure and transport systems, industry analysis, research methods, performance measurement, factor and component analysis, management, urban design, Geography |
| Topics: | Sustainability, Procurement, Construction Technology, Stakeholder Management, Research Practice, Project Management, Geographical Context, Business Strategy, Time Control, Quality Management, Urban Studies, Design Practice |
| Descriptive scope: | 4 PCTE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here