Predicting construction plant breakdown time using time series modelling

Oloke, D A; Edwards, D J and Thorpe, T A (2003) Predicting construction plant breakdown time using time series modelling. Journal of Engineering, Design and Technology, 1(2), pp. 202-221. ISSN 1726-0531

Abstract

Construction plant breakdown affects projects by prolonging duration and increasing costs. Therefore, prediction of plant breakdown, as a precursor to conducting timely maintenance works, cannot be underestimated. This paper thus sought to develop a model for predicting plant breakdown time from a sequence of discrete plant breakdown measurements that follow non‐random orders. An ARIMA (1,1,0) model was constructed following experimentation with exponential smoothening. The model utilised breakdown observations obtained from six wheeled loaders that had operated a total of 14,467 hours spread over a 300‐week period. The performance statistics revealed MAD and RMSE of 5.03 and 5.33 percent respectively illustrating that the derived time series model is accurate in modelling the dependent variable. Also, the F‐statistics from the ANOVA showed that the type and frequency of fault occurrence as a predictor variable is significant on the model's performance at the five percent level. Future work seeks to consider a more in depth multivariate time series analyses and compare/contrast the results of such against other deterministic modelling techniques.

Item Type: Article
Uncontrolled Keywords: time series analysis; exponential smoothening; autoregressive integrated moving average; construction plant breakdown; analysis of variance
Index terms: experiment, time series, dependent variable, variance, time-series analysis, construction plant, modelling, duration, statistics
Subjects: data science, analytical methods, data collection methods, mathematical modelling, statistical analysis, research evaluation and metrics, project controls, measurement and scaling, construction equipment
Topics: Research Practice, Engineering Principles, Plant and Equipment, Time Control
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here