Confined site construction: An empirical analysis of factors impacting health and safety management

Spillane, J P; Oyedele, L O and von Meding, J K (2012) Confined site construction: An empirical analysis of factors impacting health and safety management. Journal of Engineering, Design and Technology, 10(3), pp. 397-420. ISSN 1726-0531

Abstract

Purpose: The purpose of this paper is to identify, clarify and tabulate the various managerial issues encountered, to aid in the management of the complex health and safety concerns which occur within a confined construction site environment. Design/methodology/approach: This is achieved through conducting extensive qualitative and qualitative research in the form of case studies, interviews and questionnaire survey. Findings: The leading managerial issues in the management of health and safety on a confined construction site are found to be: "Difficulty to move materials around site safely"; "Lack of adequate room for the effective handling of materials"; "Difficulty in ensuring site is tidy and all plant and materials are stored safely"; "Close proximity of individuals to operation of large plant and machinery"; and joint fifth "Difficulty in ensuring proper arrangement and collection of waste materials on-site" along with "Difficulty in controlling hazardous materials and equipment on site". Practical implications: The resulting implication for practice of these results can be summarised by identifying that with sustained development of urban centres on a global scale, coupled with the increasing complexity of architectural designs, the majority of on-site project management professionals are faced with the onerous task of completing often intricate designs within a limited spatial environment, under strict health and safety parameters. Originality/value: The subsequent value of the findings are such that just as on-site management professionals successfully identify the various managerial issues highlighted, the successful management of health and safety on a confined construction site is attainable.

Item Type: Article
Uncontrolled Keywords: brownfield development; brownfield sites; case studies; construction works; health and safety; Ireland; project management; project planning; United Kingdom; United States of America; urban development
Index terms: project management, Ireland, health and safety management, site management, construction work, urban development, confined site construction, case study, waste material, United States of America, project planning, complexity, architectural design, methodology, qualitative research, questionnaire, construction site, United Kingdom, survey, interview, health and safety
Subjects: urban design, project management theory and practice, health safety and environment, Geography, research methods, design practice, systems engineering, control systems, research design and methodology, data collection methods, construction operations, environmental science, work location, operations management
Topics: Design Practice, Urban Studies, Site Management, Research Practice, Project Management, Geographical Context, Engineering Principles, Health and Safety, Sustainability
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here